Gipsy Ground Audio at Harris Hill

abenaki camp 1860 crop

From the Brattleboro Words Project website, at the bottom of the Harris Hill site-specific page (scroll down)… An audio track contributed to the multiple layers at this place. Much has been seen here, in the thousands of years it has been a dwelling place; beneath the feet of the ski jump visitors lies a long line of stories.

Podcast here: The Gipsy Ground by Rich Holschuh. Produced by Reggie Martell.

Much more info here, at another Sokoki Sojourn post.

With Andy Fisk for CRC Valley Gives at the Rock Dam

One of a series of Facebook Live on-site interviews on May 1, 2018, for the CT River Conservancy’s “Valley Gives” fundraising campaign. We are at the Rock Dam site, on the Kwenitew below the Great Falls at Peskeompscut/Mskwamakok, now Turners Falls in Montague, MA, with very high spring run-off.

VT Yankee Citizens Panel Reviews Memorandum

Three newspaper articles covering the VT NDCAP meeting held on March 22, 2018 at BUHS, to discuss the Settlement Agreement reached as part of the Docket #8880 examination of the sale of VY by Entergy to Northstar for decommissioning and site restoration.

By Richie Davis in The (Greenfield) Recorder.

By Susan Smallheer in the Rutland Herald.

By Mike Faher in VT Digger.

A followup commentary by Guy Page in the Rutland Herald.

Great River Hydro’s FERC-Filed Notes from the 3/8/18 Study Results Summary

Cover letter:

Great River Hydro, LLC (“Great River Hydro”) is the owner and licensee of the Wilder Hydroelectric Project (FERC No. 1892), the Bellows Falls Hydroelectric Project (FERC No. 1855), and the Vernon Hydroelectric Project (FERC No. 1904). The current licenses for these projects each expire on April 30, 2019. On October 31, 2012, TransCanada initiated the Integrated Licensing Process by filing with the Federal Energy Regulatory Commission (“FERC” or “Commission”) its Notice of Intent to seek new licenses for each project, along with a separate Pre-Application Document for each project.

With this filing, Great River Hydro submits its March 8, 2018 Updated Study Results Meeting Summary for the three projects, as required by 18 C.F.R. §5.15(c)(3) and the Commission’s current Process Plan and Schedule (dated February 15, 2018). The meeting for the Updated Study Reports filed between May 1, 2017 and February 9, 2018 was held at Great River Hydro’s Renewable Operations Center in Wilder, Vermont, with teleconference and call-in capability for participants who could not attend in person.

Below is a comment excerpt:

ILP Schedule – Brandon Cherry reviewed the Revised Process Plan and Schedule FERC issued on February 15, 2018, noting that GRH is required to file a progress report on May 15, 2018 and every 90 days thereafter until studies 9 and 24 are completed. The progress report is to include the status of study 33 – Cultural and Historic Resources Study.

Study 33 – Cultural and Historic Resources Study – Rich Holschuh concurred that this study is still open and indicated that while the draft TCP includes timetables for consultation, no consultation has taken place. John Ragonese disagreed that no consultation had occurred, citing several meetings with native American tribal leaders and informational resources but recognized the present open status of the study. He said the Programmatic Agreement (PA) and Historical Properties Management Plan (HPMP) are in development and will be shared for comment and review. The PA is a signed agreement among affected parties that usually includes SHPO’s, licensee and federal tribe(s). GRH suggests that no federal tribe is affected by this PA, but local tribes are and therefore should be included. The PA will reference the HPMP which includes details of how properties will be managed.

VT Nuclear Decommissioning Citizens Advisory Panel: VT NDCAP Mtg 3/22/18

Brattleboro Community TV (BCTV) has archived the proceedings at the regular Vermont Nuclear Decommissioning Citizens Advisory Panel (VT NDCAP) meeting held at Brattleboro Union High School (BUHS) on March 22, 2018. The focus of the evening was to learn about the Settlement Agreement reached between all the parties involved, with the exception of CLF. The author, representing Elnu Abenaki with the support of Nulhegan and Koasek, adds his comments regarding the process at 51:37, and answers questions at 1:10:56 and 1:18:27.

Sokwakik Today: Volunteers Prepare Accessible Trail in Northfield

greenfield recorder shelby ashline mt grace trail northfield

“Since the project began, Rasku said Mount Grace has coordinated with the Abenaki, Nipmuc, Narragansett and Wampanoag tribes due to the land’s cultural significance.

“It’s had a lot of features tribal nations would appreciate,” he said, explaining the tribes could gather medicinal plants, harvest the nearby farm fields and take advantage of the water source, making the area around the pond active.

As such, Rasku said that in making the accessible trail, Mount Grace has avoided changing the terrain or excavating out of respect for the land’s Native American history.”

Read the full article by Shelby Ashline in the Greenfield Recorder here.

*****

Interpretive signage on the Ames Trail will include information about Abenaki cultural lifeways and language translations for our many indigenous relations. Aln8baodwaw8gan!